Tech24 Deals Web Search

Search results

  1. Results from the Tech24 Deals Content Network
  2. Chicago Sanitary and Ship Canal - Wikipedia

    en.wikipedia.org/wiki/Chicago_Sanitary_and_Ship...

    The Sanitary District of Chicago (now The Metropolitan Water Reclamation District) was created by the Illinois legislature in 1889 in response to this close call. [ 3 ] In addition, the canal was built to supplement and ultimately replace the older and smaller Illinois and Michigan Canal (built 1848) as a conduit to the Mississippi River system.

  3. North Shore Channel - Wikipedia

    en.wikipedia.org/wiki/North_Shore_Channel

    North Branch Chicago River. The North Shore Channel is a drainage canal built between 1907 and 1910 to flush the sewage-filled North Branch of the Chicago River down the Chicago Sanitary and Ship Canal. [ 1] The sewage carrying duty has been largely taken over by the Chicago Deep Tunnel, but there are still occasional discharges due to heavy rains.

  4. Skokie water reclamation plant gives tours, holds open house

    www.aol.com/skokie-water-reclamation-plant-gives...

    The Metropolitan Water Reclamation District of Greater Chicago held an open house on May 4 at the O’Brien Water Reclamation Plant in Skokie in honor of Chicago Water Week.

  5. Metropolitan Water Reclamation District of Greater Chicago

    en.wikipedia.org/wiki/Metropolitan_Water...

    In 1910, the North Shore Channel was completed to provide drainage for the marshy areas north of the city and to direct lake water into the North Branch of the Chicago River for dilution. The Cal-Sag Channel was ready for operation in 1922, which also was the year the first treatment plant of the Sanitary District of Chicago was completed.

  6. Endorsements for the Metropolitan Water Reclamation District

    www.aol.com/endorsements-metropolitan-water...

    The inartfully named Metropolitan Water Reclamation District long has been the mystery agency for many voters when they enter the polling station. After wading through state lawmakers, municipal ...

  7. Jennifer Tipton with the North Shore Water Alliance submitted an email exchange in which Dick Sloan, with the DEQ, says "environmental assessment for the proposed development needs to be updated ...

  8. Chicago River - Wikipedia

    en.wikipedia.org/wiki/Chicago_River

    Discharge from the North Branch is measured at Grand Avenue; between 2004 and 2010 this averaged 582 cubic feet (16.5 m 3) per second. [40] During the winter months as much as 75% of the flow in the North Branch is due to the discharge of treated sewage from the North Side Water Reclamation Plant into the North Shore Channel. [41]

  9. Tunnel and Reservoir Plan - Wikipedia

    en.wikipedia.org/wiki/Tunnel_and_Reservoir_Plan

    Commissioned in the mid-1970s, the project is managed by the Metropolitan Water Reclamation District of Greater Chicago. Completion of the system is not anticipated until 2029, [1] but substantial portions of the system have already opened and are currently operational. Across 30 years of construction, over $3 billion has been spent on the project.